Showing posts with label Woodsetts. Show all posts
Showing posts with label Woodsetts. Show all posts

Thursday, July 30, 2026

News: OnDemand bus service aims to reconnect Rotherham

By

Residents of parts of Rotherham with limited access to scheduled bus services are being targeted by a new flexible public transport service to connect them to employment, education, healthcare, and retail.

Rothbiz reported last year that South Yorkshire Mayoral Combined Authority (SYMCA) was looking to launch a pilot project around demand responsive transport as part of its work to address connectivity issues across the region following the Mayor’s decision to take control of the buses.

Using £0.95m from the government's Transport Innovation Fund (TIF), SYMCA has appointed technology partner Via for the pilot that will begin operating from 3 August for 12 months across parts of Doncaster and Rotherham. 

The service introduces a new way of travelling, allowing passengers to book shared bus journeys through the OnDemand app up to one week in advance or by phone, with no fixed routes or timetables. 

Designed to improve connections in areas where traditional services are limited, OnDemand will help people access jobs, education, healthcare and key destinations across the region. Unlike conventional bus routes, OnDemand uses intelligent technology to group passengers travelling in the same direction, offering a flexible, efficient and affordable service. 

Fares will start from £3 per journey, with concessions and discounts available, and the service will run Monday to Saturday between 5am and 6pm.  Importantly, the new service has been designed to complement not replace the existing public transport network, helping more people connect to buses, trams and trains across South Yorkshire.  

Advertisement
South Yorkshire’s Mayor Oliver Coppard said: “The People’s Network will put people first, making sure everyone in South Yorkshire can get where they need to go, when they need to get there. OnDemand in Doncaster and Rotherham brings that idea to life, with a flexible, modern service built around our everyday lives, not fixed routes or timetables. 

“Whether it’s getting to work, visiting loved ones, making an appointment or accessing education, communities in Doncaster and Rotherham will have more choice and greater control over how to travel. OnDemand is another important step towards building a public transport system that truly works for everyone – the People’s Network.” 

The Rotherham areas included in the OnDemand area are Waverley, Ulley, Morthern, Thurcroft, Brookhouse, Dinnington, Firbeck, Letwell, Todwick, Woodsetts, Thorpe Salvin and Harthill.

Users can travel within the designated operating zone. but for those travelling beyond the zone, OnDemand can connect passengers to designated interchange hubs (Dinnington, Rotherham Hospital, Rotherham town centre, Crystal Peaks) for onward travel using buses, trams or rail services.

Cllr Chris Read, Leader of Rotherham Council, said:  “It’s great to see this pilot becoming a reality. We know that as bus services have reduced in recent decades, the impact of that has been particularly felt in more rural areas. The way that public transport operates had got to change. That’s why we wanted to prioritise this opportunity for communities to the south of our borough, complementing and enhancing existing public transport, but also offering a flexibility that traditional bus services just can’t provide. 

“So if you’re at home in Todwick or Brookhouse, for example, and you need to get to the Tanyard, Rotherham Hospital or Meadowhall and back, this service provides a new convenient way to do that. I hope that people will give it a go, and their experiences will certainly help us to shape the future of public transport in the borough.” 

OnDemand South Yorkshire website

Images: Via

Read more...

Wednesday, June 15, 2022

News: Ineos timed out at second Rotherham fracking site

By

Planning permission has lapsed at a test drilling site in Rotherham.

Oil and gas exploration and production business, INEOS secured planning permission for a drilling rig to test for shale gas at Harthill following a public inquiry in 2018.

Years later the development has not started and now planning permission is no longer in place.

It comes at the same time as Ineos was refused planning permission for a second site at Woodsetts when the Secretary of State disagreed with a Planning Inspector’s recommendation and decided to dismiss the company's appeal.

INEOS appealed to the Planning Inspectorate over the non-determination of the application at a Greenbelt site between the villages of Harthill and Thorpe Salvin.

During the course of the public inquiry, Rotherham Council was satisfied by the proposed mitigation from the applicants having previously offered reasons for refusal on transport and ecology grounds.

Advertisement
The application provided temporary permission for a maximum of five years and the operation would involve various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would have been drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

Applications were made in 2019 to discharge some of the conditions attached to the planning approval but they were never all approved by the local authority.

Chris Wilkins, development manager at Rotherham Council, explained: "The one at Harthill was approved on appeal but because they [Ineos] didn't implement the permission within the time period - becasue they couldn't discharge conditions with three years - basically the permission has run out. So that one has fallen by the wayside too.

"The two sites they had in the borough, at Woodsetts and Hartill, have now gone. Who knows if they come back with a revised scheme at one of those sites."

The government ended support for fracking in November 2019 on the basis of a report by the Oil and Gas Authority (OGA), which found that it is not currently possible to accurately predict the probability or magnitude of earthquakes linked to fracking operations.

Ineos website

Images: INEOS / Turley

Read more...

Wednesday, June 8, 2022

News: Secretary of State throws out Rotherham fracking plans

By

A long-awaited Government decision has been made on proposals for a test drilling well on a Greenbelt site in Rotherham.

INEOS' Woodsetts plans were recommended for approval, having previously been refused on ecological grounds and on highway safety. The planning board went against officer's recommendations and refused the plans based on highway grounds and noise and general disturbance. Having been successful at the inquiry over its nearby Harthill application, INEOS appealed against the Woodsetts decision.

A public local inquiry took place in 2019 where the Inspector recommended that the appeal be allowed and planning permission be granted subject to conditions.

However, the plans were not given the go ahead as the appeal was recovered for the Secretary of State's determination.

After a long wait, the decision was published this week. It concluded: "The Secretary of State [Michael Gove] disagrees with the Inspector’s recommendation. He has decided to dismiss the appeal and refuse planning permission."

The test well was considered acceptable in the Greenbelt but the main issue for refusal appears to centre on an acoustic barrier that was proposed to address noise levels to protect the amenity of affected residents.

A 3 metre high acoustic barrier would make the noise acceccptable but "the erection of the fence would create a sense of enclosure in the gardens of Berne Square."

Advertisement
The planning inspector believed that it would be perverse to refuse planning permission for the whole proposal, only because the temporary fence was considered to be inappropriate development. The Secretary of State disagreed. Likewise he disagreed with the Inspector’s assessment that the harmful impacts of the development would be outweighed by the policy support.

The government ended support for fracking in November 2019 on the basis of a report by the Oil and Gas Authority (OGA), which found that it is not currently possible to accurately predict the probability or magnitude of earthquakes linked to fracking operations.

Alexander Stafford, MP for Rother Valley, said after the decision was published: "This is fantastic news for Woodsetts and for Rother Valley, and I thank all the residents and especially Woodsetts Against Fracking, Anston & Woodsetts Councillors and all who worked together to protect our beautiful village and countryside. I know there will be many happy residents in Woodsetts tonight who will share my feelings of joy."

INEOS website

Images: INEOS / Turley

Read more...

Wednesday, January 29, 2020

News: New MP uses debut to focus on fracking

By

Alexander Stafford, the new Rother Valley MP, has used his debut appearance in the House of Commons to call for the current fracking ban to be made permanent.

The government ended support for fracking in November on the basis of a report by the Oil and Gas Authority (OGA), which found that it is not currently possible to accurately predict the probability or magnitude of earthquakes linked to fracking operations.

Exploratory work to determine whether shale could be a new domestic energy source, delivering benefits for our economy and energy security, has now been paused - unless and until further evidence is provided that it can be carried out safely here.

Rotherham has seen two planning applications from oil and gas exploration and production business, INEOS, for similar test drilling wells. It was successful at a public inquiry over its Harthill application and appealed against a refusal for a site at Woodsetts.

A decision on the Woodsetts application is expected in April.

Advertisement

During a debate on climate change, Stafford asked the Minister for Business, Energy and Clean Growth, Kwasi Kwarteng: "Will my right hon. Friend agree with the residents of Woodsetts and Harthill in Rother Valley that the best way his Department can tackle climate change is to make the moratorium on fracking permanent?"

In reply, the minister said: "On fracking, the moratorium is what it says: we are stopping it. The only way it can be resumed is by compelling evidence, which so far is not forthcoming. So the moratorium stays and fracking, for the time being, is over."

Images: Alexander Stafford / Twitter

Read more...

Friday, March 15, 2019

News: Planning board votes on stance ahead of INEOS public inquiry

By

The planning board at Rotherham Council has voted on officer's recommendations to withdraw objections on highways grounds from INEOS' Woodsetts appeal process "in light of the lack of evidence."

Rothbiz revealed last week that officers believed that it could not fight its refusal of the plans by the oil and gas exploration and production business for a test drilling well on a Greenbelt site.

The plans were recommended for approval, having previously been refused on ecological grounds and on highway safety. The planning board went against officer's recommendations and refused the plans based on highway grounds and noise and general disturbance. Having been successful at the inquiry over its Harthill application, INEOS appealed against the Woodsetts decision.

Chris Wilkins, development manager at Rotherham Council, explained at a board meeting this week: "Following the refusal of the planning application the Transportation Unit have reviewed the information raised by Members in relation to safety concerns and, while recognising that these concerns are valid, do not consider that they would warrant a refusal of planning permission for the proposed development.

"For reasons of transparency and to allow an independent review of this assessment the Highway Authority [the Council] has then attempted to commission consultants who could re-assess the information and represent the Council's case at the forthcoming Public Inquiry.

"Responses were received from five separate consultants who had reviewed the information but were unable to provide a robust case to support the reason for refusal. One further consultant has indicated that they would be prepared to provide expert evidence in support of the highways reason for refusal but the information provided is not considered to be sufficiently robust to defend the decision to refuse the application on the highways grounds."

Costs to the Council and legal advice also points to the highway grounds refusal being withdrawn and that the decision is seen as "pragmatic and appropriate."

Advertisement

The noise and general disturbance reason will still be defended at the appeal by the Council, especially in relation to the HGVs used in developing the site. Woodsetts Against Fracking (WAF) have gained "Rule 6" status, which means that they will have equal standing to the Council and INEOS at the public inquiry and can still raise objections on highways and other grounds.

Richard Scholey, of WAF also spoke at the meeting and said that members voting to refuse planning permission in September was "a fine example of the planning system working as it was intended as planning officers should not have the final say on planning decisions." He added that nothing had changed since members voted for refusal.

The campaigner also accused the Council of self-protectionism and a lack of transparency.

Ian Ferguson, senior highway development control officer at Rotherham Council, told the board that he feels that the highways reasons for refusal would be "very difficult to defend" at an appeal.

Planning board member Cllr. Jenny Whysall, said: "At the meeting where we refused this application, I can't actually see any reason to change the views that we put forward then. And I'm not saying this lightly - I've thought long and hard about this - I think we have to look at what we do, and are, as a planning board because it seems to suggest to me that we are superfluous if we accept that officers are always right. And I say that with admiration for our team of officers but I think on this one, we have a moral obligation.

"We have every right to disagree and it's no reflection on anyone when we do that. We are not professional planners but we do know the places that we represent."

Fellow planning board member Cllr. John Williams: "We have got to have the confidence as decision makers that the Council has got a good chance of winning that appeal because to do otherwise, I think, is irresponsible. Cllr. Whysall talked about a moral responsibility but we also have a legal responsibility. We have to make good, responsible, sound and legal decisions."

He added that the consultants not being able to provide a robust case showed that there was a strong reason to remove the reasons for refusal.

The planning board voted to approve the recommendation to remove the highways grounds from the appeal objections.

INEOS said in a statement: "This has been a waste of time and money for everyone involved and we are disappointed that this objection was mounted in the first place. The Council has now acknowledged that defending a Planning Enquiry on the grounds it presented was a futile exercise that would incur significant cost and that dropping it was pragmatic and appropriate. We regret that this outbreak of common sense didn't occur earlier and that the Council's frivolous attitude to public money still continues in the form of their other objections to the scheme."

Images: INEOS

Read more...

Friday, January 18, 2019

News: INEOS appeal Rotherham refusal

By

Oil and gas exploration and production business, INEOS has submitted a planning appeal to overturn Rotherham Council's decision to refuse permission for a second test drilling well in the borough.

In September 2018, the planning board at Rotherham Council unanimously voted to refuse plans for a Greenbelt site at Woodsetts.

The application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

Now planning consultants, Turley, have submitted paperwork to the Secretary of State to appeal the decision.

It now looks likely that another public inquiry will take place to hear the arguments for and against.

In June 2018, INEOS was granted planning approval for a drilling rig to test for shale gas in nearby Harthill following a public inquiry. INEOS appealed to the Planning Inspectorate over the non-determination of the application at another Greenbelt site.

Advertisement

In submitting the second set of plans for Woodestts, INEOS urged the council to vote for approval in order to "avoid the potential for a second appeal, and the associated costs claims that may be made in light of the lack of evidence behind the reason for refusal."

The updated plans were actually recommended for approval, having previously been refused on ecological grounds and on highway safety. INEOS provided additional ecological surveys and data following earlier criticism and pointed to the decision of the planning inspector in the Harthill case.

When plans were determined, planning officers said that the highway reasons for refusal could be defended at a public inquiry if a subsequent planning appeal is made.

Campaigners in the borough are still battling INEOS. A community group has been granted a hearing date for a judicial review into the planning inquiry which favoured INEOS and its proposed development at Harthill. It centres on when updated plans from INEOS were made public and the group not knowing the full case they had to meet until the inquiry.

INEOS wants to carry out further tests on the suitability of the area for hydraulic fracturing (fracking).

INEOS website

Images: INEOS / Turley

Read more...

Friday, November 23, 2018

News: "Let communities decide" on fracking

By

Rotherham Council leader, Chris Read has joined 850 councillors and other elected representatives in signing an open letter opposing government proposals to allow fracking companies to undertake exploratory drilling without local planning applications.

Rothbiz reported earlier this year that the Government said it would consult on whether shale exploration should be treated as permitted development, which enables certain types of work to be carried out without the need to apply for planning permission.

INEOS appealed to the Government's Planning Inspectorate last year for a decision on its proposed test well at Harthill with Rotherham Council upset by the way the oil and gas exploration business took the decision out of the hands of its planning authority.

Over 800 councillors have signed an open letter calling for the withdrawal of proposals that treat exploratory drilling by fracking companies as permitted development, and to respect the rights of communities to make decisions on shale gas activities through the local planning system.

The Government is proposing that exploratory drilling for shale gas should be granted planning permission through a permitted development right. This right means fracking companies don’t need to apply for planning permission from the local authority. Permitted development is a category of planning originally designed to facilitate minor structural changes to homes such as extensions and putting up sheds.

Advertisement

The government consultation closed on October 25 and has prompted hundreds of Councillors to express concern that the proposals are an affront to local democracy and risk industrialising the countryside. The letter – sent to the Secretaries of State for Housing, Communities and Local Government, and Business, Energy and Industrial Strategy, James Brokenshire MP and Greg Clark MP – has also been signed by MPs, Parish Councillors, and London Assembly Members.

Cllr. Chris Read said: "Permitted Development is designed for minor home improvements, not major industry. Ministers should drop these proposals."

Rotherham Council's approved response to the consultation, said: "The Council does not consider that any such non-hydraulic fracturing exploration should be permitted development, primarily as it would remove the local level of decision making and local accountability that communities expect.

"Whilst exploratory drills are not for full hydraulic fracturing (fracking), they can still have a significant impact on the locality, as evidenced at Harthill and Woodsetts. The correct route for such development is through the normal planning application and, where necessary, appeal process."

Plans for a test well at Harthill were approved by the planning inspector. The Woodsetts plans were refused by the planning board at Rotherham Council.

Images: INEOS

Read more...

Monday, September 10, 2018

News: Rotherham planning board votes against INEOS test well proposals

By

Another planning appeal from INEOS looks likely after the planning board at Rotherham Council again went against the recommendations of its officers to refuse an application for a test drilling well.

Rothbiz reported first that INEOS' Woodsetts plans were being recommended for approval, having previously been refused on ecological grounds and on highway safety.

The first set of plans were unanimously voted against with the resubmitted application much closer at seven votes to five.

The application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site, which is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course, would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing (fracking).

Updated transport analysis and mitigation measures were submitted, allaying the concerns of the transport planners and Highways England. More ecological survey information had also been submitted. The officers also took into account the recent public inquiries, for Harthill in Rotherham and Marsh Lane near Eckington, where INEOS had secured permission, and recent updates from the Government on the national importance of shale gas.

Advertisement

A number of issues were raised as the planing board heard from INEOS and its planning consultants before objectors to the scheme including the local parish council and Woodsetts Against Fracking.

Officers addressed the issues and concerns and discussed the conditions attached to granting the application such as restricting HGV movements and lighting. Monitoring of the proposed test well was also discussed.

In submitting the plans, INEOS urged members to vote for approval in order to "avoid the potential for a second appeal, and the associated costs claims that may be made in light of the lack of evidence behind the reason for refusal."

Cllr. Jenny Whysall took exception to the firm's approach, saying it had shown "breathtaking arrogance." She added that it was patronising and "vaguely threatening."

Planning board members voting against the plans set out reasons for refusal. Cllr. Stuart Sansome, planning board member, explained: "We believe that the highway issues which were raised previously, those concerns have still not been clearly met to our satisfaction and that on the environmental issues raised, we've still not received enough information of clarity to give us a feeling to accept the proposal."

Planning officers believe that the highway issues could be defended at a public inquiry if a subsequent planning appeal is made. A full decision for refusal is set to be published this week.

INEOS website

Images: INEOS / Turley

Read more...

Friday, August 31, 2018

News: INEOS Woodsetts plans recommended for approval

By

INEOS' re-submitted plans for a second test drilling well in Rotherham are being recommended for approval, having previously been refused by the Council's planning board.

Rothbiz reported in June that following the conclusion of a successful appeal over plans at Harthill, the oil and gas exploration and production business re-submittted plans for a Greenbelt site at Woodsetts.

The application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site, which is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course, would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing (fracking).

In March, members of the planning board voted unanimously to refuse the plans on ecological grounds and also added in another reason for refusal based on highway safety.

Now the same board members are being recommended to approve the plans by council planners.

Advertisement

INEOS has provided additional ecological surveys and data following earlier criticism and has pointed to the decision of the planning inspector in the Harthill case.

The applicants stated: "This application has been re-submitted to offer an opportunity to rectify that decision [the refusal] and thus to avoid the potential for a second appeal, and the associated costs claims that may be made in light of the lack of evidence behind the reason for refusal."

Updated transport analysis and mitigation measures have also been submitted, following initial concerns raised by Highways England. The Council's Transportation Unit concludes that "safe and suitable access to the site can be achieved and the cumulative impact of the development in transport terms is unlikely to be severe."

A number of conditions are proposed regarding the route to the site including signage, escort vehicles (when required), convoy systems and restricting any abnormal loads to traveling between 10am and 4pm.

On the other previous reason for refusal, a report to the planning board states: "Overall the [Council's] Ecologist considers that the supporting information on this aspect of the application, whilst lacking in some detail, is now sufficient to overcome the earlier reason for refusal, and subject to final lighting details being submitted as part of a condition, this aspect can now be considered acceptable."

The report adds that fracking forms no part of the application and that the proposals have been assessed on their own merits. Weight has also been given to proposed changes in national policy.

Like previous applications, a number of objections have been submitted. Other issues assessed include landscape, safety, air quality, noise and hydrology.

INEOS website

Images: Marriott Drilling / INEOS / Turley

Read more...

Monday, June 18, 2018

News: INEOS re-submits application for second Rotherham test well

By

On the back of a successful appeal, oil and gas exploration and production business, INEOS has re-submitted a planning application for a second test drilling well, which was previously refused by Rotherham Council's planning board.

The plans state that additional survey work has been undertaken and that the decision at the appeal shows that councillor's concerns over transport have not been backed up by evidence and that ecological reasons for refusal "would be difficult to defend."

The Government's planning inspector recently allowed an appeal for INEOS' initial plans to test for shale gas at a Green belt site at Harthill. This decision has given the firm confidence to re-submit a similar set of plans for a site at Woodsetts that were refused on similar grounds - transport and ecology.

The application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site, which is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course, would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing.

Advertisement

The Council's ecologist considered that the first application had a significant lack of supporting data due to lack of, or incomplete surveys and as such the Council could not adequately assess the submitted details. In March, members of the planning board voted unanimously to refuse the plans on ecological grounds and also added in another reason for refusal based on highway safety.

The senior highway development control officer at Rotherham Council had ultimately been happy with INEOS' transport management plans for both Harthill and Woodsetts. At the recent inquiry into the Harthill proposals, the plannig inspector concluded: "I am satisfied that there would be no residual, cumulative and severe impacts from the proposal that would make it unacceptable on transport grounds"

Resubmitting the plans on behalf of INEOS, planning consultants, Turley said: "The Inspector has clearly made his decision based on the technical evidence, and has given little weight to the points raised by members, as these were not supported by evidence of any harm. We consider that the same approach would be adopted in respect of the highways reason for refusal proposed by members for the Woodsetts application.

"This application has been re-submitted to offer an opportunity to rectify that decision and thus to avoid the potential for a second appeal, and the associated costs claims that may be made in light of the lack of evidence behind the reason for refusal."
On ecology, INEOS states that the Council's reasons against the Harthill and Woodsetts proposals are similar and that "given the Council's position under cross examination and the ultimate withdrawal of the reason for refusal at Harthill, we consider it would be professionally very difficult to seek to defend the same reason as applied to the Woodsetts development.

"We consider that the ecology reason put forward to refuse it can no longer be substantiated. This again offers the Council the opportunity to avoid a future Inquiry and potential claims for costs based on there being no evidence to support the reason for refusal."

INEOS website

Images: INEOS / Turley

Read more...

Friday, May 25, 2018

News: Future Rotherham fracking plans could be taken out of council hands

By

Rotherham Council was upset by the way INEOS' oil and gas exploration took the decision out of the hands of its planning authority for a test drilling well but they may not get the chance to determine forthcoming applications if the Government pushes through changes to the way shale exploration plans are dealt with.

The Government said it would consult on whether shale exploration should be treated as permitted development, which enables certain types of work to be carried out without the need to apply for planning permission.

INEOS appealed to the Government's Planning Inspectorate last year for a decision on its proposed test well at Harthill.

Having been given the "hurry-up" by Government, INEOS said that it had encountered "unreasonable delays" in dealing with Rotherham Council on its plans for a drilling rig on Greenbelt land.

A recent planning inquiry heard objections from the Council and from local and national campaign groups whilst INEOS put forward reasons why the plans should be approved.

In Westminster last week a written statement on energy policy was put forward which focused on the planning system and speeding up decisions relating to shale exploration.

In 2015, the Government set out a range of measures to help ensure every planning application or appeal was dealt with as quickly as possible. However, recent decisions on shale exploration planning applications remain "disappointingly slow" against a statutory time frame of 16 weeks where an Environmental Impact Assessment (EIA) is required.

For the two INEOS sites in Rotherham - Harthill and Woodsetts, Council planners determined that the proposed projects fall outside the remit of the EIA regulations.

The applications would provide temporary permission for a maximum of five years and the operation would involve various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

Advertisement

The statement set out a range of measures to facilitate timely decisions on shale exploration decisions. To be treated as a material consideration when deciding on plans, it discusses the importance of shale to the UK economy.

For example, the Government said that it would continue to treat appeals against any refusal of planning permission for exploring and developing shale gas, or against any non-determination "as a priority for urgent determination by the Planning Inspectorate, making additional resources available where necessary."

The Secretary of State for Housing, Communities and Local Government will also actively consider calling in shale applications particularly where statutory deadlines have been exceeded.

Greg Clark, Secretary of State for Business, Energy and Industrial Strategy, said: "Shale gas development is of national importance. The Government expects Mineral Planning Authorities to give great weight to the benefits of mineral extraction, including to the economy. This includes shale gas exploration and extraction.

"Mineral Plans should reflect that minerals resources can only be worked where they are found, and applications must be assessed on a site by site basis and having regard to their context. Plans should not set restrictions or thresholds across their plan area that limit shale development without proper justification.

"We expect Mineral Planning Authorities to recognise the fact that Parliament has set out in statute the relevant definitions of hydrocarbon, natural gas and associated hydraulic fracturing. In addition, these matters are described in Planning Practice Guidance, which Plans must have due regard to. Consistent with this Planning Practice Guidance, policies should avoid undue sterilisation of mineral resources (including shale gas)."

A revised planning practice guidance on shale development is set to be published when the revised National Planning Policy Framework has been launched and a planning brokerage service and £1.6m shale support fund is being launched to support planning authorities.

In addition, an early stage consultation is scheduled for summer 2018 on the principle of whether non-hydraulic fracturing shale exploration development should be treated as permitted development, and in particular on the circumstances in which this might be appropriate. Permitted developments derive from a general planning permission granted not by the local authority but by Parliament.

Consultation would also take place on the criteria required to trigger the inclusion of shale production projects into the Nationally Significant Infrastructure Projects regime. Included projects are decided by the Planning Inspectorate, the national government executive agency.

Claire Perry, Energy and Clean Growth Minister, said: "British shale gas has the potential to help lower bills and increase the security of the UK's energy supply while creating high quality jobs in a cutting-edge sector. This package of measures delivers on our manifesto promise to support shale and it will ensure exploration happens in the most environmentally responsible way while making it easier for companies and local communities to work together."

Images: INEOS

Read more...

Friday, May 11, 2018

News: INEOS' Harthill planning decision awaited

By

Planning officers at Rotherham Council are unsure if the Government's planning inspector will approve or refuse plans for a test drilling well at Harhill.

During the course of the recent public inquiry, Rotherham Council has been satisfied by the proposed mitigation from oil and gas exploration and production business, INEOS.

INEOS appealed to the Planning Inspectorate over the non-determination of the application for a drilling rig on Greenbelt land between the villages of Harthill and Thorpe Salvin.

The Council had set out its stance against the scheme with reasons for refusal focusing on highways issues and a lack of detail in the submitted ecological reports.

The application would provide temporary permission for a maximum of five years and the operation would involve various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

Shortly before the public inquiry, INEOS submitted further details which meant that the Council's transport planner had to put forward the authority's views at the inquiry whilst having the professional opinion that the updated mitigation proposals would mean that the application could be approved on transport issues.

The inquiry, which ended last week, heard objections from the Council and from local and national campaign groups whilst INEOS put forward reasons why the plans should be approved.

Advertisement

Chris Wilkins, development manager at Rotherham Council, said: "We are waiting now for a decision from the inspector - anticipated to be four to six weeks. Hand on heart, I've got no idea which way it will go.

"Obviously INEOS put up extra information late on in terms of highways. And the ecology issue, we felt, was addressed during part of the inquiry process but residents were there raising a number of concerns that the inspector has to take into account before he comes to his decision."

Wilkins added that the authority has not yet had any follow up to INEOS's second set of plans for a similar exploratory well at Woodsetts that were refused by the planning board in March. The Council is anticipating that INEOS will either appeal the decision or submit a revised application with new studies to address the concerns of the council ecologist.

The company is hoping to carry out tests on the suitability of the area for hydraulic fracturing.

INEOS website

Images: UKSE

Read more...

Friday, March 9, 2018

News: Rotherham's planning board votes to refuse INEOS plans

By

Members of the planning board at Rotherham Council have voted unanimously to refuse proposals for a test drilling well at Woodsetts.

As reported by Rothbiz last week, the application was being recommended for refusal by planners after the council ecologist highlighted that the ecological information submitted by INEOS and its planning consultants, Turley, was insufficient.

The application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site, which is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course, would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing.

Nigel Hancock, assistant planning manager at Rotherham Council, talked the board through Greenbelt use and impacts on traffic, water, noise, landscape and heritage.

Advertisement

Tom Pickering, operations director at INEOS Shale, discussed the strategic importance of shale gas to the UK. He told the board that he was surprised that the application was being recommended for refusal, adding that he was sure that concerns could be overcome by planning conditions.

The Council's ecologist considers that the application has a significant lack of supporting data due to lack of, or incomplete surveys and as such the Council cannot adequately assess the submitted details.

A number of action groups and residents expressed opposition to the proposals and following discussion, cllrs. on the planning board voted to add in a second reason for refusal based on traffic and transport impacts.

Unlike similar INEOS plans at Harthill, the senior highway development control officer at Rotherham Council, states that the Woodsetts plans can be supported from a highways point of view.

Taking a vote on the proposals, the board memebers voted unanimously to refuse the plans on ecological and transport grounds.

INEOS said that it was disappointed with the decision. A spokesperson said: "The application allows for the drilling of a single vertical core bore well to gain scientific knowledge of what is below the surface, which has been agreed by many Councils many times in the past to support the coal industry. This is no different. It is important to note that a completely separate application must be made for the extraction of gas."

On INEOS' proposals for a shale gas test drilling well in Harthill, the public inquiry is set to begin on April 24 at Rotherham Town Hall and could last two weeks.

INEOS website

Images: INEOS / Turley

Read more...

Thursday, March 1, 2018

News: Second set of INEOS plans recommended for refusal

By

The ecologist at Rotherham Council has put forward a number of reasons why INEOS' plans for a test drilling well at Woodsetts should be refused.

Rothbiz reported last month that, unlike the Harthill application, the Woodsetts application can be supported from a highways point of view, despite transport objections being raised from the local parish council and campaign groups.

The application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site, which is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course, would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing.

The application is set to be discussed by the Council's planning board next week and the planner's report sets out all related issues including the Greenbelt use and impacts on traffic, water, noise, landscape and heritage.

Consultees such as Public Health England, Health and Safety Executive and the Environment Agency are not objecting to the plans.

The proposal is not considered to represent inappropriate development in the Greenbelt and on transport, the report concludes that safe and suitable access to the site can be achieved with the cumulative impact of the development in transport terms considered unlikely to be severe.

Advertisement

However, the report makes it clear that the ecological information submitted by INEOS and its planning consultants, Turley, is insufficient.

Andy Godfrey, ecological development officer at Rotherham Council, makes a number of points on the applicant's habitat surveys.

For example, the Phase 1 habitat survey did not include Dewidales Wood, an area of ancient woodland that is 25 metres from the site. The applicant was denied access but the ecologists expected surveys to be carried out from the adjacent bridleway or from the site.

The report states: "The lack of survey work on breeding birds, badgers or other wildlife by the applicant within Dewidales Wood means that it is not possible to know what is present and consequently the Council does not know what might be impacted." The authority cannot tailor mitigation for the woodland due to lack of data.

The ecologist is critical of the surveys for badgers, bats and breeding birds. For example, the applicant's Environment Report states: "No birds were observed on the proposed site during the extended Phase 1 habitat survey or during subsequent visits to the site for bat surveys." The Council's ecologist considers it unlikely there were no birds whatsoever on any of the surveys.

The ecologists also doesn't agree with the impacts, such as lighting, construction and development and noise, being considered "Not Significant."

The report concludes: "Overall, the Council's ecologist considers that the application has a significant lack of supporting data due to lack of, or incomplete surveys and as such the Council cannot adequately assess the submitted details.

"The Council considers that the applicant has submitted insufficient evidence of attempts to try alternative methods where access could not be obtained. It is not considered that these issues could be satisfactorily considered and it is therefore recommended that the application is refused on lack of ecological information n and in conflict with paragraph 118 of the NPPF." This is the national planning guidance which states that local planning authorities should aim to conserve and enhance biodiversity.

Having been denied the chance with the first set of INEOS plans at Harthill, members of the planning board will vote on whether to refuse the plans on March 8.

On INEOS' proposals for a shale gas test drilling well in Harthill, the public inquiry is set to begin on April 24 at Rotherham Town Hall and could last two weeks.

INEOS website

Images: INEOS / Turley

Read more...

Friday, February 9, 2018

News: Fracking firm finding favour with second set of Rotherham plans

By

INEOS looks to be in a better position to achieve planning permission for its second identified site in Rotherham at Woodsetts.

The planning board at Rotherham Council recently confirmed its objections to INEOS' plans for a test drilling well at its first site Harthill over highways and ecology issues. As it stands, these same issues are not considered by the authority as reasons for refusal for the second site at Woodsetts.

If approved, both applications would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing.

Rothbiz reported last month that the decision on the Harthill site will be made following a public inquiry that is scheduled to begin in April.

Both sites are within the borough's Greenbelt. Rotherham Council planners considered that the Harthill proposals do not represent inappropriate development in the Greenbelt - often a reason for refusal. The decision was justified by planners over the relatively short term period and that plans include proposals to restore the land after use (any potential future fracking activity would require a further application).

Plans were submitted last year for the second site which is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course.

On the Harthill site, planners concluded, and planning board members agreed, that the proposed traffic management plans were inadequate and that they were unsatisfied that it includes adequate mitigation in terms of protecting the safety of other road users on the intended route along Packman Lane and Common Road.

Advertisement

In responding to the details of the Woodsetts plans, Ian Ferguson, senior highway development control officer at Rotherham Council, states that it can be supported from a highways point of view, despite transport objections being raised from the local parish council and campaign groups.

The proposals would lead to a "significant percentage increase" in traffic through Woodsetts but the actual number of HGV movements as a result of the proposals are considered to be "relatively modest."

A maximum of 60 HGV movements a day are estimated by the applicants. The route to and from the site includes vehicles travelling along the C70 from Gateford roundabout which is considered satisfactory for HGVs.

With a 30mph limit through the village and mitigation measures such as signage and the use of convoys and escorts, the traffic management plan is unlikely to be put forward as a recommended reason for refusal.

Ferguson said: "I am of the opinion that safe and suitable access to the site can be achieved and the cumulative impact of the development in transport terms is unlikely to be severe. Accordingly, the development can be supported from a highway aspect, subject to a number of conditions."

The conditions include a traffic management plan being signed off by the Council, new signage being installed and further details being submitted regarding on-site vehicle areas, parking and turning.

On the Harthill plans, the borough's ecologist put forward a reason for refusal based on being unsatisfied with the ecological surveys and assessments undertaken by the applicant. On the Woodsetts plans, the ecology officer has asked for more surveys and information before a decision is made.

The consultation period for the Woodsetts application is set to end on February 16.

As it stands, a decision will be made by councillors on the planning board who showed their frustration and upset at INEOS "bypassing" local decision-making and "treating local democracy with contempt" and taking the application straight to a national planning inspector.

INEOS website

Images: INEOS / Turley

Read more...

Monday, November 27, 2017

News: INEOS set to sidestep Rotherham planning authority

By

INEOS' oil and gas exploration and production business looks set to go over the heads of the planning authority in Rotherham and go straight to the Government's Planning Inspectorate for a decision on its Harthill test well, having encountered "unreasonable delays."

Rothbiz reported last month that INEOS' plans for a drilling rig on Greenbelt land between the villages of Harthill and Thorpe Salvin were heading refusal after the Council's trasnport planners raised concerns over road safety regarding "the introduction of a significant number of additional large commercial vehicles along these narrow country lanes."

Now, Lee Rowley, MP for North East Derbyshire, where INEOS is also progressing plans for shale gas exploration, has published a draft press statement which he says shows the latest on the plans from the £35 billion turnover firm.

It reads: "INEOS has lodged three applications for test drilling activity in the East Midlands. With no decisions made by local Councils on two of them in reasonable time periods, INEOS will ask the Planning Inspectorate to intervene. INEOS felt that decisions would not be forthcoming despite granting a number of time extensions."

The Rotherham application was due to be discussed at a special meeting of the planning board that was pencilled in for November 23. The consultation period ended on November 3. Rotherham Council, one of the best performing planning authorities in the country in terms of determining applications on time, had asked for an extension of time until early in 2018.

The application has attracted over 1,000 representations. 1,129 are against the proposals and 0 are for the proposals.

Advertisement

The statement from INEOS adds: "INEOS has always prioritised local consultation so is disappointed that the decision will not be taken at local level – however we cannot wait indefinitely.

"This decision has not been taken lightly and we understand the pressures on the local councils – these are nationally important issues being made at a local level. It is our duty to explore our licence areas and we have recently had the "hurry-up" from the Government's Oil and Gas Authority."

The statutory time limits are usually eight weeks for non-major applications, 13 weeks for major applications or 16 weeks for applications subject to an environmental impact assessment. Where a planning application takes longer than the statutory period to decide, and an extended period has not been agreed with the applicant, the Government's policy is that the decision should be made within 26 weeks at most.

Consultation on the Rotherham application began on June 13 2017, 24 weeks ago.

INEOS also said in its statement: "The work would bring inward investment into the local area with the possibility that the sites could be used for shale gas development if the surveys are successful.

"We are also disappointed that a strong shale presence in the region has not been more welcomed given the recent manufacturing decline in the region as a result of energy costs, including the almost closure is the former TATA steel works in Rotherham, now Liberty Speciality Steel."

INEOS Shale website

Images: INEOS / Turley

Read more...

Thursday, November 16, 2017

News: INEOS details plans for Woodsetts fracking test site

By

Environmental studies included in a detailed planning application have led to INEOS' oil and gas exploration and production business concluding that there would be no detrimental impact on the local environment from its second proposed shale gas testing well in Rotherham.

Rothbiz reported in August that land to the south of Dinnington Road at Woodsetts is the second Rotherham Greenbelt location for a proposed test drilling operation as it searches for shale gas.

A type of natural gas, shale gas has the potential to become an important energy source for the UK, as it is in the US, but extracting the gas using a method called "fracking" (hydraulic fracturing) has negative environmental impacts.

The second site is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course.

If approved, the application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing.

Advertisement

Prepared by Turley on behalf of INEOS Upstream Limited, the plans conclude: "A number of environmental studies have been carried out which support the application and conclude that there would be no detrimental impact on the local environment. The design has evolved to take into account the information and feedback received during the consultation process and mitigation measures have been incorporated into the application where necessary."

The studies cover areas such as noise, traffic and transport, ecology, landscape and hydrogeology.

A planning application is currently being assessed for INEOS's first exploration site in the borough - at a site between the villages of Harthill and Thorpe Salvin. Rotherham Council has raised concerns over road safety regarding "the introduction of a significant number of additional large commercial vehicles along these narrow country lanes."

Traffic analysis shows that both projects are expected to generate 70 total daily movements with 60 HGV movements for a period during site development and establishment and the drilling, coring and pressure transient testing stage.

The Woodsetts application states that during construction there would be fewer than ten HGV movements per day for the majority of the time. On up to 40 days there would be more than ten movements per day and for three weeks there would be between 50-60 movements per day (five per hour over a 12 hour period) when aggregate is brought to the site.

During drilling there would be fewer than ten daily HGV movements for most of the period, with periods at the beginning and end of drilling stage of between 20 and 42 HGV movements daily (two to four per hour over a 12 hour day). In addition there would be up to 16 movements greater than 32 tonnes at the start and end of the stage as the rig is mobilised and demobilised.

A traffic management plan has been drafted showing how the vehicles will travel through Woodsetts village between the drilling site and the A57. It adds that, with mitigation measures, "the changes in traffic volume would not be sufficient to materially alter road safety risk."

INEOS website

Images: INEOS / Turley

Read more...

Monday, October 16, 2017

News: Rotherham Council consider fracking ban

By

Members of Rotherham Council are set to debate the contentious issue of fracking this week with the ruling Labour councillors hoping to pass a motion that would commit the authority to not allow any fracking activities on Council land.

The motion, put forward by Cllr. Beck and seconded by Cllr. Wilson, comes as the authority deals with its first shale gas related planning applications.

INEOS' oil and gas exploration and production business has two proposals on Greenbelt land in the Rotherham borough where it has also been carrying out seismic testing. A site at Harthill was first identified as an exploration site and a second site at Woodsetts has now been selected. Both sites have been identified as being in an area of interest to INEOS based on existing seismic data.

A type of natural gas, shale gas has the potential to become an important energy source for the UK, as it is in the US, but extracting the gas using a method called "fracking" (hydraulic fracturing) has negative environmental impacts.

Advertisement

The proposals involve building a drilling rig and drilling vertically, deep into the ground (around 2,800m) to find out how much gas is in the shale. This does not involve fracking.

INEOS claim that that there would be no detrimental impact on the local environment from its proposed 60 metre high shale gas testing well at Harthill.

Rotherham Council is expected to schedule a special meeting of the planning board in November given the large number of representation letters that have been received. A breakdown of the representations shows that 1,009 are objecting to the proposals and 0 are in support.

As well as putting forward general objections to fracking, the objections focus on the potential impact on highway safety and wildlife, the visual impact, noise and geological issues related to mining.

An application for the Woodsetts site is due to be submitted shortly.

The motion to Rotherham Council, notes that all planning applications relating to fracking must be considered on their merits in planning terms, within the rules set out by the Government, but asks that the Council, "commits to not allow any fracking activities, including survey work, on Council owned or controlled land and property."

Images: INEOS


Read more...

Thursday, October 12, 2017

News: Second set of fracking plans pass first environmental test

By

In the latest step in potential fracking in the borough, planners at Rotherham Council have ruled that a second proposed test drilling operation on a Greenbelt site by INEOS, "would not be likely to have significant effects on the environment" in relation to national planning guidelines.

Rothbiz reported in August that land to the south of Dinnington Road at Woodsetts is the second Rotherham Greenbelt location for a proposed test drilling operation as it searches for shale gas.

INEOS recently submitted a planning application for its first exploration site in the borough - at a site between the villages of Harthill and Thorpe Salvin. Both sites have been identified as being in an area of interest to INEOS based on existing seismic data.

A type of natural gas, shale gas has the potential to become an important energy source for the UK, as it is in the US, but extracting the gas using a method called "fracking" (hydraulic fracturing) has negative environmental impacts.

The proposals involve building a drilling rig and drilling vertically, deep into the ground to find out how much gas is in the shale. This does not involve fracking. INEOS is working with consultants at Turley on the plans.

Advertisement

Rotherham Council has now determined if the project falls within the remit of the Environmental Impact Assessment (EIA) Regulations - whether it were likely to have "significant effects on the environment by virtue of factors such as its nature, size or location."

The authority's planners have ruled that it does not, as they did for the Harthill site.

The regulations were established as part of national planning policies to ensure that local planning authorities make decisions in the full knowledge of the likely significant effects, and takes this into account in the decision making process.

The subsequent application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. The site would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing.

Even at up to 60m in height, the drilling rig, the size of the proposed development is not considered to be significant in its effects in the context of the regulations. A rig is only likely to be on site for five months.

Other impacts have also been considered, including visual and landscape impacts, ecology, noise, flood risk and traffic.

The council report concludes: "It could be claimed that the proposed development represents preparatory works for a more substantial development [fracking] and as such should not be considered in isolation.

"If considered as an integral part of a wider single development project then EIA might be required in respect of the whole project. However in this case, having regard to the exploratory purpose of the proposed vertical well, it would be possible for the well development to proceed without any extractive developments following from it. Therefore this does not appear to be a case of a proposal which for the purpose of screening is to be regarded as an integral part of an inevitably more substantial development."

A detailed planning application, which is still likely to include an environmental impact assessment, is now expected to be submitted.

INEOS' Harthill application is scheduled to go to a special planning board meeting in November.

A motion has been put forward for debate at the next full Council meeting that, if agreed, would not allow any fracking activities, including survey work, on Council owned or controlled land and property.

INEOS website

Images: Google Maps


Read more...

Friday, August 4, 2017

News: INEOS selects second shale gas site in Rotherham

By

Land to the south of Dinnington Road at Woodsetts in Rotherham is the second Greenbelt location for a proposed test drilling operation by INEOS' oil and gas exploration and production business.

INEOS has recently submitted a planning application for its first exploration site in the borough - at a site between the villages of Harthill and Thorpe Salvin. Both sites have been identified as being in an area of interest to INEOS based on existing seismic data.

A type of natural gas, shale gas has the potential to become an important energy source for the UK, as it is in the US, but extracting the gas using a method called "fracking" (hydraulic fracturing) has negative environmental impacts.

The second site is on agricultural land at Dewidales Wood, close to Woodsetts, Rackford Farm, Anston Stones Wood (a Site of Special Scientific Interest (SSSI)) and Lindrick golf course.

A Screening Report has been submitted for the first stage in the process - exploration, which involves building a drilling rig and drilling vertically, deep into the ground to find out how much gas is in the shale. This does not involve fracking. INEOS is working with consultants at Turley on the plans.

Advertisement

The report precedes an application to drill a vertical core well and Rotherham Council will need to determine if the project falls within the remit of the Environmental Impact Assessment (EIA) Regulations - whether it were likely to have "significant effects on the environment by virtue of factors such as its nature, size or location."

On the first site, Rotherham Council, determined that INEOS' proposed project falls outside the remit of the Environmental Impact Assessment (EIA) Regulations, concluding that: "The impacts from the proposed development are found not to be likely to be so significant, either individually or collectively, such as to require EIA."

The Government's Planning Casework Unit (PCU) has confirmed that the screening request was acceptable and that in the opinion of the Secretary of State, the application does not represent EIA development. The authority did however ask INEOS to submit detailed environmental impact assessments with the full application.

Advertisement

The screening report for the Woodsetts site very much mirrors the Harthill report, outlining how the subsequent application would provide temporary permission for a maximum of five years and the operation would involve months of various site investigation surveys and site preparation before a period of drilling, coring and testing. A well would be drilled to approximately 2,800 m using a drill rig of maximum 60 m rig height followed by three months of testing.

The site would be restored after the activity has taken place and tests will be carried out on the suitability of the area for hydraulic fracturing.

Members of the public cannot comment specifically on the Screening Request but a spokesperson for INEOS, confirmed: "We have entered into pre-application discussions with Rotherham Metropolitan Borough Council to discuss potential environmental impacts of the proposed development which will be subject to consultation with a number of external bodies. During this process we will undertake community consultation to take account of feedback from local residents before submitting a full planning application.

"To help ensure the local community is kept informed as we go through the planning process, we have offered to participate in a Community Liaison Group alongside the local Parish Councils."

INEOS, which recently started six months of seismic surveys in the area, has obtained a High Court Injunction to protect its sites, people, suppliers and the public "from the militant activists who try to game the system and cause maximum disruption."

INEOS website

Images: Google Maps / INEOS


Read more...
Members:
Supported by:
More news...

  © Blogger template Newspaper III by Ourblogtemplates.com 2008

Back to TOP