Showing posts with label Kier Construction. Show all posts
Showing posts with label Kier Construction. Show all posts

Friday, June 19, 2026

News: What the new £8m café means for Rother Valley

By

Kier Construction has delivered an incredible new café and events facility in Rotherham which stands to be an important asset for the future of Rother Valley Country Park.

Work began on The Waterfront in 2024 creating a new state of the art building housing a new eatery and indoor function space with views extending over the lake.

Opening in April and set in a stunning lakeside location, The Waterfront Café has been thoughtfully designed to deliver an exceptional visitor experience, with over 200 covers in a modern, light-filled setting that makes the most of the surrounding views.

Alongside the café, The Waterfront Function Space offers a versatile venue for events, celebrations and community gatherings, all within a striking contemporary building that connects seamlessly with the natural landscape.

It is envisaged that the new building will help host a million visitors per year who come to the park for events, food, and the many leisure pusuits and water sports on offer.

Tom Hague, senior site manager for Kier, said: "This building matters for a number of reasons. First of all, this site is very well visited. It offers a range of activities and opportunities for people in the local area. But it's seen very little investment since it opened in the early 80s. And this creates more opportunities. The existing facilities are starting to become a little bit tired. And there is opportunity here to get more people in and offer a greater offering for the wider public within this area.

"I think getting people outdoors and into this sort of environment is quite key. This site is situated between Rotherham and Sheffield, and it draws upon that area and the larger region. It's well known for the activities on offer down here, such as the water sports, various different biking and walking opportunities as well. And this facility enables people to come down and enjoy that space and get outdoors.

"This project means a lot to me because I've got a lot of memories and history here. I've spent many weekends here on the water sailing, undertaking various different water activities. I'm often running around the lake as well. I'm a local person to this project. I live in Rotherham, so it's fantastic to be able to deliver projects here where I live. And it's a facility that I'm going to use and bring my family down as well."

Advertisement
Funding for the project came from the government's Levelling Up Fund, where Rotherham Council was successful in securing £19.5m for the town centre and £19.9m for a number of connected projects around the leisure industry.

Neil Best, Head of Commercial Development and Visitor Experience at Rotherham Council, said: "The project is really important not only for the borough but specifically for Rother Valley in that, since post-COVID, green spaces, as you'll know across the country, have seen a massive influx of visitors, and this is no exception. We get nearly a million visitors a year here now. And the facilities that have been here previously just clearly weren't sufficient to deal with that number of visitors.

"So, we had a fantastic opportunity through what was then the Levelling Up Fund to invest in the park, and this project is the result of several years of endeavour along with [architect] AHR and Kier.

"We are now able to cater for visitors all year round. We have an opportunity to develop a new strain of business in the park through our events programme. We will also be able to cater for bigger events within the park, and obviously, it's an asset in its own right — people will come to visit it."

The Waterfront website

Images: Kier

Read more...

Thursday, April 17, 2025

News: New heading for Rotherham sailing club

By

Contractors, Kier are making headway with a multimillion pound development at a Rotherham country park and now plans have been drafted for a new home for a local sailing club.

A £7.4m contract got underway at the end of 2024 for an improvement and regeneration project at Rother Valley Country Park in Rotherham, the centrepiece being a new waterfront café.

Rotherham Council confirmed last year that the scope for the project had reduced with some aspects of the orignal plans removed, affecting the future of Firbeck Sailing Club.

Advertisement
A planning application from Kier and Rotherham Council explains: "A new visitors centre is being provided on the existing site historically occupied by Firbeck Sailing Club. A development site had been designated just south of the Water Sports & Activities Centre building to rehome Firbeck Sailing club, however, due to budgetary restrictions associated with redeveloping this site, a new location has been selected further south along the lake which will provides a more cost-effective location to construct a new boat storage and welfare facility for Firbeck Sailing Club."

The new site is closer to the Cable Waterski & Aqua Park - the North of England's biggest cable wake park.

Proposals are to construct a sailing club with parking spaces, boat bays and a welfare unit. The secure storage compound also includes a slipway.

Built on grassland, the propsal will result in both the permanent and temporary loss and/or alteration of some of the habitats located on the proposed re-development site. Consultant's reports and the council's ecology department make a number of reccomendations regarding the loss of habitats and biodiversity net gain.

Securing money from the Government's Levelling Up Fund (LUF), £19.9m was awarded for a number of connected projects which aim to build a new leisure industry that responds to the challenges of economic recovery and health and well-being.

At Rother Valley, physical works were programmed to commence in Autumn 2024 and complete in Autumn 2025.

Images: Firbeck Sailing Club / Facebook

Read more...

Wednesday, November 6, 2024

News: Kier appointed to Rotherham water treatment scheme

By

Kier has been awarded a contract to design and build a proposed water treatment scheme in Rotherham for the Coal Authority.

The Group’s Natural Resources, Nuclear & Networks business division will undertake the stage one design and enabling works leading into the construction for stage two for the scheme at Thorpe Hesley.

Rothbiz reported on the plans to address the issue of flooding in abandoned deep mine workings back in July. Planning permission has yet to be determined.

Kier will design and build a pumped-passive mine water treatment scheme that will be made up of settlement ponds, reed beds and associated pipework on a five-hectare site on land adjacent to the former colliery site. The mine water will be treated through an aeration cascade and a system of settlement ponds and reed beds and then the treated water will be discharged into the watercourse.

The design phase started in August 2024 and, once the construction phase is completed, new trees and bushes will be planted as well as wildflowers to provide new habitats, improve biodiversity and increase wildlife in the area. Access tracks around the reed beds will allow people to enjoy the natural atmosphere of the scheme and link the scheme with existing footpaths.

Advertisement
Eddie Quinn, managing director for Kier Natural Resources, Nuclear & Networks’ Environment business, said: "We’ve been working closely with the Coal Authority and applying our skills and experience designing and building engineering schemes with vital long-term habitat creation to support the needs of this scheme in Yorkshire.”

The contract has been awarded through the Pagabo public sector procurement framework.

James Bagnall, Coal Programme Lead, for the Coal Authority, said: “We are looking forward to working with Kier to deliver this important environmental scheme at Thorpe Hesley, as part of our work to provide long term management of rising mine waters.

“The Coal Authority manages over 80 mine water treatment schemes across Britain, handling and treating over 122 billion litres of water a year. At Thorpe Hesley, mine water levels have been rising since the 1980s and this important mine water treatment scheme will help to protect drinking water and the local environment.”

Thorpe Pit (later known as Smithy Wood Colliery) operated from 1886 – 1974. Plans state that at the Thorpe Hesley site, pumping is likely to be required by the end of 2025 "in order to mitigate risks of contamination of the overlying groundwater aquifers and prevent any uncontrolled surface discharge and the subsequent pollution of watercourses."

The Coal Authority delivers a program of facilities covering 70+ mine water treatment schemes across England, Scotland and Wales, ensuring that any accumulated mine water is responsibly treated before entering natural watercourses. It is set to go out to tender this month as it establishes a £100m mine water treatment works framework.

Kier website
Coal Authority

Images: Google Maps

Read more...

Thursday, October 10, 2024

News: Kier commit to country park upgrade in Rotherham

By

A £7.4m contract is underway for an improvement and regeneration project at Rother Valley Country Park in Rotherham.

Securing money from the Government's Levelling Up Fund (LUF), £19.9m was awarded for a number of connected projects which aim to build a new leisure industry that responds to the challenges of economic recovery and health and well-being.

Planning permission was secured for a £5.5m upgrade, the centrepiece being a new waterfront café, but the work has been delayed after market testing resulted in budgets being revised "as a result of the impact of inflation and the volatile national and international construction market."

Rotherham Council has confirmed that the scope for the project has now been reduced and it comes at an additional cost.

At Rother Valley the plans showed that the new café would have a seating capacity of 134 offering beautiful views over the lake. The seating area is also dual aspect - the café space looks over a new play area to the rear, creating a safer place for parents to watch while their children play.

Advertisement
Some aspects of the approved scheme have been removed such as a new, landscaped events space, a new riverside walk between the events space and the existing car park and the relocation of the cycle centre to a more prominent position. Consultation has been carried out regarding the the relocation of Firbeck Sailing Club to accommodate boat storage, access to the water and meeting facilities.

Having signed up for stage 1 of the contract with Rotherham Council, Kier Group Plc has now signed up at stage 2 for the construction of the new visitors centre, external works and the overflow car parks.

The contract has a total value of £7,484,897.30.

With Pathfinder status, Rotherham is able to make changes to its government-funded regeneration programmes and is no longer continuing with using Town Deal money for its Parkgate-Eastwood Bridge scheme that has faced complexities around Network Rail infrastructure and private land issues. Money for the bridge was moved to the country park schemes having been approved by cabinet.

Physical works were programmed to commence in Autumn 2024 and complete in Autumn 2025. Work has started on the car parking facilities, the first section is the area to the right of the main park road before the main bridge.

Last year Rothbiz revealed the ambitions of a masterplan for Rother Valley which could potentially include hosting bigger events, new play areas, zip slides and toboggan runs.

Rother Valley Country Park website

Images: RMBC

Read more...

Wednesday, July 17, 2024

News: Rising costs sees Rotherham country park regeneration schemes scaled back

By

Proposed regeneration schemes at two country parks in Rotherham have had to be scaled back with Thrybergh impacted most. Government funding has been reallocated so that the projects can go ahead.

Securing money from the Government's Levelling Up Fund (LUF), £19.9m was awarded for a number of connected projects which aim to build a new leisure industry that responds to the challenges of economic recovery and health and well-being.

A £2.5m improvement plan for Thrybergh Country Park moved a step closer last year after plans for a new café building were approved by the council.

At Rother Valley Country Park, planning permission has been secured for a £5.5m upgrade - the centrepiece being a new waterfront café.

Contractors were also lined up to carry out the work but a new council report states that, following market testing, both projects required "revised budgets as a result of the impact of inflation and the volatile national and international construction market."

Rotherham Council's cabinet are being asked to approve the new way forward which means that there is a "reduced scope" for the Thrybergh scheme where a new café building has been scrapped and replaced by a refurbished café and outside space.

At Rother Valley, plans for a new build waterfront café and new car park would go ahead, with some aspects, such as a landscaped events space taken out.

The council report states: "This option delivers most closely to the original intentions of the LUF scheme in that it will achieve improvements at both sites, creating impact for residents and delivering the greatest economic benefits and supporting the financial recovery of Rother Valley Country Park. However, this is at a reduced scope to that set out to Cabinet in August 2023 and it comes at an additional cost."

There has been an overall increase in the programme budget of £2.310m.

With Pathfinder status, Rotherham is able to make changes to its government-funded regeneration programmes and now plans to not continue with using Town Deal money for its Parkgate-Eastwood Bridge scheme that has faced complexities around Network Rail infrastructure and private land issues. Money for the bridge is expected to be moved to the country park schemes if approved by cabinet.

At Rother Valley, contractors, Kier are set to proceed with construction of the new facilities in September 2024 with completion in October 2025. The tender with I&G Ltd for Thrybergh will not proceed and a new procurement exercise will be required.

The report adds: "Supporting the financial recovery of Rother Valley County Park is seen as a priority for the Leisure & Culture Service with the new build café and events space seen as a critical step in achieving that goal.

"The alterations to the café at Thrybergh Country Park will enhance the current offer with planned improvements to the kitchen facilities enabling an upgrade to the menu along with an increase in the number of outdoor covers and improved access between the indoor and outdoor dining experience."

Images: RMBC / Kier ? I&G

Read more...

Tuesday, August 8, 2023

News: Council lines up contractors for £8m country park cafés

By

Contractors are close to being appointed for the multimillion pound upgrades at two of Rotherham's country parks, only rising costs have led to a little less levelling up as the schemes are scaled back.

Securing money from the Government's Levelling Up Fund, £19.9m was awarded for a number of connected projects which aim to build a new leisure industry that responds to the challenges of economic recovery and health and well-being.

However, refinement of the proposals has been necessary due to "cost constraints, inflation and market challenges."

At Rother Valley Country Park, planning permission has been secured for a £5.5m upgrade - the centrepiece being a new waterfront café.

The new café will have a seating capacity of 134 offering beautiful views over the lake. The seating area is also dual aspect - the café space looks over the new play area to the rear, creating a safer place for parents to watch while their children play.

At Rother Valley, Kier Construction Ltd is being lined up for the second stage of a two-stage design and build contract for the delivery of works.

An update from the council now shows that other aspects of the scheme have been dropped, including a light touch refurbishment of existing café, education centre, mill building and water wheel that would have improved facilities and developed the courtyard area. Further funding would also need to be found to improve and extend the existing play areas and improve car parking.

Rothbiz revealed the ambitions of a masterplan for Rother Valley which could potentially include hosting bigger events, new play areas, zip slides and toboggan runs.

Advertisement
At Thrybergh Country Park, planning permission has been secured for the demolition of the existing lakeside café and the erection of a replacement café building and seating terrace (cgi, above).

Replacing an existing building that is considered to be outdated and no longer fit for purpose, the new space will be able to accommodate 80 covers inside and 40 outside.

The Sewell Group and Illingworth and Gregory Ltd are set to be awarded the second stage of a two-stage design and build contract for the delivery of works at Thrybergh.

The £2.5m project had also included a new car park to provide an additional 152 spaces but an update from the council shows that this is no longer in the plans.

A report to Rotherham Council's cabinet explains that new cafés were top of the list during consultation. On the changes, the report adds: "During the development of the project scope and design, the volatile national and international construction market and the impact of inflation has increased the estimated costs of materials, construction, fees and the availability of contractors.

"The design has been prudent in ensuring adequate value engineering whilst meeting the aims of the Levelling Up Fund, public feedback and the Council’s objectives for the leisure economy."

Rothbiz reported last week that the council was set to use just over £1m from the UK Shared Prosperity Fund (UKSPF) to support the delivery of capital schemes in the LUF programme as shortfalls have been identified at Gulliver's Valley, Wentworth Woodhouse and Maltby Learning Trust.

Cllr. Chris Read, leader of Rotherham Council said that "economic headwinds were against us" but added: "We want to deliver as much of it as possible. We are using some of our UKSPF money to top up some of our schemes that are coming through because right across they are all facing similar challenges. We are moving this as quickly and as sensibly as we can but we have to do that in a way that it is a proper product, not something that is bodged together."

RMBC website

Images: AHR

Read more...

Friday, October 27, 2017

News: Education Secretary revisits her Rotherham school

By

Education Secretary, Justine Greening this week visited Oakwood High School in Rotherham, the comprehensive secondary school she attended as a pupil in the 1980s, for the official opening of its new, state-of-the-art buildings.

The school has undergone a £12.2m refurbishment as part of the Government's Priority School Building Programme, which is focused on rebuilding and revamping school premises. The new facilities at Oakwood High include specialist science, art and music rooms, a large gymnasium, and a separate dining hall – all under one roof.

The Conservative minister, who went on to attend Thomas Rotherham College, was given a tour of the school by current pupils and by former teachers Richard Townsend and John Bingham, who taught at Oakwood High during her time as a pupil at the school.

Advertisement

Education Secretary Justine Greening said: "Returning to Oakwood High School was incredibly special to me. I had amazing teachers here who inspired me.

"I want every young person to be able to reach their full potential and great teachers are at the heart of that. It's great to be back in Rotherham and to see Oakwood High helping raise the aspirations of new generations of young people from the area, making sure they have the skills and knowledge to achieve their goals."


David Naisbitt, headteacher at Oakwood High School, said: "We understand that children and young people need positive role models. Here in Rotherham, our young people need to see that opportunity does not lie beyond their grasp – it rests firmly within the realm of their possibilities.

"There is no better example of what can be achieved than the Secretary of State; a local girl, educated in her local community.

"The new school building will act as a beacon and stands as a clear statement to this community of the value of education."

The first comprehensive school educated secretary of state for education studied at Southampton University, earning an MBA from the London Business School and used to work in business.

Kier Construction was the lead contractor on the Oakwood project.

Oakwood High School website

Images: DFE

Read more...

Thursday, July 6, 2017

News: Hockey club returning to Rotherham

By

Kier Construction has got the ball rolling on a brand new pitch for Rotherham Hockey Club.

The club, which celebrates its 90th anniversary this year, has confirmed that it will be returning to Rotherham to play home fixtures at a purpose built facility which is taking shape in Brinsworth

Founded in Rotherham in 1927, the club has had a number of bases in the borough during its long history but, following the closure of the Firth Rixson Aurora sports ground and clubhouse, four years ago, and due to a lack of suitable alternative venues in the town, was forced to relocate to Westfield Sports College in Sheffield for all playing and coaching activities and home games and to The Belfry public house for post-match hospitality.

Now a new facility, which is on the site of the old Aurora sports ground, is part of a joint venture with Sheffield Hallam University, the institution which which opened its £6m sports park on adjacent land, just over the borough boundary, in 2013.

Advertisement

The University acquired the former Aurora site and the park will now add hockey to the list of sports predominantly played there, which includes football, rugby, American football, lacrosse and cricket.

Having secured planning permission earlier this year, Kier Construction has made rapid progress in laying the new pitch in time for the new season.

In addition to a dedicated artificial hockey pitch, which will meet England Hockey's standards for top-flight hockey, the new development will include disability access to pitch side, the refurbishment of a spectator stand, welfare facilities, floodlighting, landscaping and car parking.

Jon Warden, Kier site manager for the project, said: "We're extremely pleased to be delivering this new facility for Sheffield Hallam University and Rotherham Hockey Club, through the Scape minor works framework. When complete, this new centre will provide top-class hockey facilities for the area and we're all looking forward to seeing the first match played here later this year."

The handover to SHU will be in August when the pitch will be ready for the coming 2017/18 season with league matches due to start end September 17. An official opening of the facility is being planned alongside hockey events during September.

James Swinscoe, chairman of Rotherham Hockey Club, said: "Rotherham Hockey Club are delighted to be involved in this joint venture. We have worked very closely and collaboratively with Sheffield Hallam University to bring hockey back into the Rotherham Borough, thereby providing tremendous opportunities for both Rotherham Hockey Club and its wider audience. We are very excited about the future."

Dave Woodward, youth co-ordinator at Rotherham Hockey Club, added: "Since the closure of the Firth Rixson Aurora Sports Club and forced move into Sheffield our membership has declined and our outreach work in local schools has suffered. We have worked hard to get back to a new site in Rotherham. The scheme will be a major boost to both our club and the University and will provide a first class facility that can be enjoyed by all those involved in the sport and help us achieve our targets in developing the sport to all but especially young people."

Rotherham Hockey Club website
Kier website
SHU website

Images: Rotherham Hockey Club


Read more...

Wednesday, October 26, 2016

News: Construction starts on Rotherham shared station

By

Kier Construction has begun work on the project to create a new joint police and fire station in Rotherham.

The project at Maltby won Government Transformation Funding of £560,000 last year and will help save both South Yorkshire Police and South Yorkshire Fire & Rescue money by sharing building running costs. It will also improve services by making it easier for police and firefighters to share knowledge, skills and expertise when tackling common issues, like anti-social behaviour and road traffic collisions. In a similar way, it will also help both organisations to reach the most vulnerable members of the community.

Maltby fire station will close and Maltby police station will be modified to accommodate fire service vehicles and staff, under the plans approved by Rotherham Council last year.

Chief Fire Officer James Courtney, Police & Crime Commissioner Dr Alan Billings, South Yorkshire Police Superintendent Sarah Poolman and Fire Authority member Cllr Pat Haith attended an event to formally begin work on the site.

James Courtney, Chief Fire Officer at South Yorkshire Fire & Rescue, said: "This move makes perfect sense for us, for the police and for the taxpayer. Instead of having two public buildings, and all the running costs associated with them, we will be able to combine our resources into one facility to provide a more efficient frontline service.

"By working alongside each other under one roof, the move will also benefit both organisations by improving how we work together to solve problems we both face, which can only help to improve the quality of the service we offer to local people."

Advertisement

Dr Alan Billings, South Yorkshire Police and Crime Commissioner, said: "The move to accommodate both South Yorkshire Police and South Yorkshire Fire and Rescue staff under one roof is a huge step in our commitment to the public to reduce costs and work more collaboratively.

"The diminishing government grants for both organisations are requiring all of us to be most cost effective, whilst still providing the same levels of service. I hope that the police and fire station will prove to be a successful pilot and we can identify further opportunities for blue light services to work together."

Superintendent Sarah Poolman of South Yorkshire Police, added: "The layout of this purpose-built facility will assist internal information and intelligence sharing among police staff, as it's better designed to help meet the demands of modern policing, demands that have changed substantially since the existing station was constructed many years ago on Main Street.

"We envisage that sharing the building with our partners at the Fire and Rescue Service will improve both parties input into collaborative projects too, delivering a better coordinated service to the public."

The new facility is expected to open in spring 2017.

The third high profile public sector project in the borough, Kier is also the lead contractor on the Urgent Care Centre at Rotherham Hospital and the redevelopment of Oakwood School.

Kier Construction website

Images:


Read more...

Wednesday, January 27, 2016

News: Kier reach milestone at Rotherham’s new Emergency Centre

By

Principal supply chain partner, Kier Construction has reached a significant milestone at the £12.2m Emergency Centre that is being built at Rotherham Hospital.

Hospital doctors and local GPs, accompanied by key partners of the project, gathered on the building site of the extension to give the newly erected steel frame the seal of approval. The steel work now clearly marks out the shape and size of the centre which is due to open in 2017.

The Emergency Centre is set to bring modern, enhanced expert healthcare to local people, enabling doctors and nurses from a range of medical and clinical backgrounds to work better together by sharing skills and resources to provide the best treatment for the patients of Rotherham. 

The new state-of-the-art centre is set to provide a better service for patients - 24 hours a day, 7 days a week, 365 days a year all under one roof. It is being developed in partnership with NHS Rotherham Clinical Commissioning Group, The Rotherham NHS Foundation Trust and Care UK.

Kay Stenton, emergency care consultant at Rotherham NHS Foundation Trust, said: "Now that the Emergency Centre is taking physical shape we can really visualise how the building will look when it is finished."
The trust is under extreme pressures with a high volume of patients attending A&E. Staffed by highly skilled clinicians across the emergency department and primary care, the integration of skilled staff is expected to ensure that the most appropriate clinician will see the patient, reducing the need for handovers between staff and improving the patient flow.

Plans were drawn up by Gilling Dod Architects, working with Kier Construction who where selected via the ProCure21+ National Framework, and the new integrated service will comprise a two storey development with an overall floor area of approximately 1,850 sq m, linked to the main hospital. The ground floor will provide clinical accommodation and the upper floor will provide office and staff supporting accommodation. The new extension has been designed to complement the hospital's existing main entrance that was redeveloped in 2011.

Adjacent to the Moorgate site, Kier Construction is also leading on the multimillion pound rebuild at Oakwood High School

Kier Construction website
Rotherham Emergency Centre website

Images: Rotherham NHS Foundation Trust

Read more...

Thursday, December 3, 2015

News: Kier selected for Rotherham shared station

By

Kier Construction has been selected as the main contractor for a project to create a new joint police and fire station in Rotherham.

The project at Maltby won Government Transformation Funding of £560,000 last year and will help save both South Yorkshire Police and South Yorkshire Fire & Rescue money by sharing building running costs, enabling funding to be targeted at frontline services.

Maltby fire station will close and Maltby police station will be modified to accommodate fire service vehicles and staff, under the plans approved by Rotherham Council.

The development off Byford Road is expected to improve services by making it easier for police and firefighters to share knowledge, skills and expertise when tackling common issues, like anti-social behaviour and road traffic collisions. In a similar way, it will also help both organisations to reach the most vulnerable members of the community.

SYFR Director of Finance & Resources Beverley Sandy, said:"This move makes perfect sense for us, for the police and for the taxpayer. Instead of having two public buildings, and all the running costs associated with them, we will be able to combine our resources into one facility to provide a more efficient frontline service.

"By working alongside each other under one roof, the move will also benefit both organisations by improving how we work together to solve problems we both face, which can only help to improve the quality of the service we offer to local people."

Dr Alan Billings, South Yorkshire Police and Crime Commissioner said: "We are constantly looking for ways in which to work in collaboration with partners and implement efficiency savings. I welcome this move to bring both emergency services together to serve the community of Maltby."

With planning permission approved, the new facility is expected to open in 2016.

This is the latest high profile contract win for Kier in Rotherham with the firm already working on the Urgent Care Centre at Rotherham Hospital and the redevelopment of Oakwood School.

Kier website

Images: SY Fire

Read more...

Monday, February 9, 2015

News: Kier involved in second Rotherham school rebuild

By

Kier Construction is working on a second school redevelopment project in Rotherham as consultation begins on the rebuilding of Wath Victoria Primary School.

It comes as further schools in the borough are confirmed as making it onto the Government's school rebuilding programme.

As a leading construction, services and property group, Kier has already won £153m worth of contracts through the first phase of the £2.4 billion government programme that is rebuilding 260 of the schools in England in the worst condition. It was named as a contractor on multimillion pound plans for the rebuilding of Oakwood High School in Rotherham where applicants hope to start on site this winter with the new school building planned to be complete by July 2016 (pictured).

Now, a public consultation has been organised by Wath Victoria and Kier Construction for this Thursday showcasing the new school building that is designed to accommodate 280 pupils aged 3-11, with an additional 26 nursery places. Plans for the new school, set to be located within the grounds of the existing school, are set to be submitted this month and set for completion in April 2016.

Like Oakwood, Wath looks set to be a capital funded project, funded directly by the Education Funding Agency (EFA), though the Priority School Building Programme (PSBP).

£98m worth of Building Schools for the Future (BSF) projects at Abbey SEN, Aston, Hilltop SEN, Milton, Oakwood, St Pius and Swinton in Rotherham were stopped by the coalition government in 2010.

The ambitious plan by the Labour government to rebuild every secondary school in England was controversially axed by Michael Gove, the then Secretary of State for Education, who told the Commons at the time that the scheme had been hit by "massive overspends, tragic delays, botched construction projects and needless bureaucracy."

More than 700 school building projects in the country were cancelled when BSF was scrapped and it meant that only one school on Rotherham, the converted Maltby Academy, progressed a major revamp.

The government said today that thanks to the Priority School Building Programme, school buildings are being rebuilt faster and cheaper than those built under the Building Schools for the Future initiative. Under the BSF it took three years for construction work to begin. This was slashed to one year for the Priority School Building Programme, with projects costing around a third less.

This week the government announced details of how over £4 billion will be allocated between 2015 and 2018 to schools, local authorities, academy trusts, and voluntary-aided partnerships to help them improve the condition of schools across the country.

Rotherham schools: Brinsworth Comprehensive (which has already submitted plans for work to its sports hall); Saint Pius X Catholic High School; St Bernard's Catholic High School; Newman School and Harthill Primary School have been successful in their applications to the second phase of the PSBP, and will "now have the condition needs in one or more of their buildings addressed as part of the programme."

Deputy Prime Minister Nick Clegg said: "It is crucial that we invest properly in education, so that every child has a fair start in life. ​Thousands of pupils will benefit from better, brighter, warmer classrooms thanks to this ​funding.

"Children can't learn and teachers can't teach in schools that are cold and have leaking roofs.

"To create a stronger economy we have to invest in a fairer society so that our young people can be successful in the future."

Education Secretary Nicky Morgan added: "As part of our long term economic plan, we have continued to invest in school buildings which will ensure we can deliver even more great new schools, transform the learning environment for tens of thousands of pupils and their teachers whilst delivering value for money for the taxpayer."

After missing out in the first round, Swinton Community School and St. Pius X Catholic High School were put forward by Rotherham Council for much needed repairs. The council's cabinet also agreed to put forward Badsley Moor Lane Junior School, Harthill Primary School, Wales Primary School, Laughton Junior and Infant School and Newman School.

Images: Kier / Oakwodd High School

Read more...

Friday, August 15, 2014

News: Kier in line for Rotherham new school contract

By

Kier Construction looks to have secured the multimillion pound contract for the significant new build school on the site of Oakwood High School in Rotherham.

In 2012, the school, formerly known as Oakwood Technology College, made it onto the Priority School Building Programme (PSBP), the government's centrally managed programme set up to address the needs of the schools most in need of urgent repair.

With 1,000 children on site on a daily basis, in a building that was designed for maximum of 600 pupils, plans have been developed for a three storey school building with a sports hall to replace the current buildings at Oakwood.

A planning application has now been submitted, put together by architects at the Building Design Partnership, listing Kier Construction as the contractor. As a leading construction, services and property group, Kier has already won £153m worth of contracts through the first phase of the £2.4 billion programme that is rebuilding 261 of the schools in England in the worst condition.

A capital funded project, funded directly by the Education Funding Agency (EFA), the new building at Oakwood will be located near Moorgate Road on the site of the existing science block and lower gym. It locates the teaching accommodation in a block that runs parallel to Moorgate Road with the sports hall, PE, music and drama spaces located together to the rear of the site facing the playing fields to the south.
The teaching block comprises three storeys with classrooms located either side of a central corridor. The performance block is two storeys but as the site rises from Moorgate Road the levels allow this to be set at level 1, a full floor height above the entrance level, creating a better relationship with the adjacent sports pitches.

David Naisbitt, headteacher at Oakwood High School, said: "We very much hope to have a purpose built school projecting a strong and positive image out onto Moorgate Road. This main arterial route needs to have strong statement about what education can be and we believe that the plans for this project very much allow for that message to be communicated.

"We hope that a new build will allow for us to work beyond the core hours and we would hope to develop a building which would be used by greater numbers of our community.

"Our intention and commitment is that the building will match our high expectations for learning and academic success and very much believe that this project will add to the outstanding provision which Oakwood High School brings to this community."

With plans submitted, the applicants hope to start on site this winter with the new school building planned to be complete by July 2016.

A second round of the national PSBP has recently been announced. After missing out in the first round, Swinton Community School and St. Pius X Catholic High School are being put forward by Rotherham Council for much needed repairs.

Oakwood High School website

Images: Building Design Partnership

Read more...
Members:
Supported by:
More news...

  © Blogger template Newspaper III by Ourblogtemplates.com 2008

Back to TOP